From loading dock to live — servers racked, wired, and production-ready.
When racks of GPU and enterprise servers arrive, every day they sit in boxes is capital sitting idle. Corevia takes delivery at the dock and hands them back racked, cabled, configured, tested, and commissioned — a production-ready cluster, at any data center in the country.
Your GPUs are too valuable to sit in boxes.
AI build-outs land on brutal timelines, and high-density racking, fabric cabling, firmware baselining, and burn-in are specialized work. A miswired fabric or an inconsistent BIOS can cost weeks of debugging once training starts. Corevia takes delivery at the dock and returns a fully tested, documented, production-ready deployment — so your cluster earns its keep from day one.
Every step from dock to production.
A complete deployment and commissioning service for enterprise and AI/GPU infrastructure.
Rack & stack
Receiving, asset tagging, rail installation, and precision rack mounting to spec — weight, airflow, and containment planned in.
Structured cabling
Power, copper, and fiber cabling to TIA/BICSI standards — labeled, dressed, and documented, including high-speed AI fabric.
Power-up & electrical
PDU and whip connection, phase balancing, and sequenced power-on with redundancy verified before anything boots.
BIOS & firmware configuration
Firmware and BIOS baselining plus BMC/IPMI/Redfish setup to one consistent golden configuration across the fleet.
Network configuration
Switch, VLAN, routing, and management-plane setup, plus low-latency RoCE/InfiniBand fabric tuned for GPU clusters.
OS installation & provisioning
Automated bare-metal provisioning (PXE/imaging), drivers, and hardening — delivered ready for your stack.
GPU server configuration
NVIDIA driver and CUDA, fabric manager, NCCL, and NVLink/NVSwitch validation — AI/ML training-ready out of the gate.
Testing & burn-in
Hardware validation, thermal and stress burn-in, GPU diagnostics, and link/throughput verification to catch faults early.
Troubleshooting & remediation
Fault isolation, RMA coordination, and remediation of any hardware or configuration issues surfaced in testing.
Commissioning & handover
Final acceptance testing, as-built documentation, asset records, and a clean handover to production.
What you get back.
- Expensive GPU and enterprise hardware goes from crate to production in days, not weeks
- Consistent, documented golden-image builds across every node — no snowflakes to debug later
- Burn-in and validation catch dead-on-arrival and marginal hardware before your workloads depend on it
- One nationwide smart-hands team to receive, deploy, and commission at any facility
Workmanship to data-center standards.
Every deployment is executed to recognized cabling, electrical, and quality standards — clean, labeled, documented, and audit-ready — with technicians experienced on the latest AI/GPU platforms.
- High-density cabling and labeling to ANSI/TIA-568 and BICSI best practices, fully documented
- AI fabric expertise — InfiniBand and RoCE — cabled and validated for GPU clusters
- GPU platform proficiency — NVIDIA drivers, CUDA, NCCL, and NVLink/NVSwitch
- ESD-safe handling and OSHA-trained technicians on every engagement
- As-built documentation, asset records, and acceptance test results at handover
From delivery to go-live, faster.
What our server deployment and commissioning programs are built to deliver.
Not weeks to production
Hardware burn-in tested
Documented handover
Smart-hands coverage
AI servers arriving and no time to lose?
Ship them to the floor — we'll rack, cable, configure, test, and hand you a production-ready cluster.